Advanced search
Image Title Class Type Description Investigation Date Creation Date (document)
Tharros Site Description of the site of Tharros 2023-10-19
TH2023 SU 8003 A8_Stratigraphic_Unit fill Topsoil in Drain 3 2023-06-06/2023-06-09 2023-06-14
TH2023 SU 8002 A8_Stratigraphic_Unit fill Topsoil in Area B 2023-06-06 2023-06-14
TH2022 SU 8001 A8_Stratigraphic_Unit fill Topsoil in Area A 2023-06-14
TH2022 SU5063 A8_Stratigraphic_Unit stone construction Basalt foundation 2023-06-12
TH2022 SU5060 A8_Stratigraphic_Unit stone construction Rocky platform 2022-06-30 2023-06-12
TH2022 SU5054 A8_Stratigraphic_Unit stone construction Republican Wall 2022-06-29 2023-06-12
TH2022 SU5009 A8_Stratigraphic_Unit stone construction North/South wall through trench 2023-06-12
TH2022 SU5008 A8_Stratigraphic_Unit stone construction Cut block feature on east 2023-06-12
TH2022 SU5007 A8_Stratigraphic_Unit stone construction Orthostat feature on south wall 2022-06-03 2023-06-12
TH2023 areas 8-9-10000 Site research investigation The investigation areas from 2023 season 2023-06-05/2023-07-12 2023-06-12
Franzoi, Bailey Person
Katkin, Molly Person
Karl, Kevin Person
Palanca, Fenella Person
Monhollen, Leslie Person
Kerns, Rebecca Person
TH2023 Trench 10000 job 494 (3D model) D1_Digital_Object terrain 2023-06-12
TH2023 Trench 10000 Place excavation trench 2023-06-05/2023-07-12 2023-06-12
TH2023 Trench 9000 job 492 (3D model) D1_Digital_Object terrain The 3D model of trench 9000 job 492 2023-06-12
TH2023 Trench 9000 Place excavation trench 2023-06-05/2023-07-12 2023-06-12
Grogan, Kelly Person
Tharros campaign 2023 A9_Archaeological_Excavation research investigation 2023-06-05/2023-07-12 2023-06-12
Notarian, Matt Person
Allen, Colton Person
TH2023 Trench 8000 Place excavation trench 2023-06-05/2023-07-12 2023-05-12
TH2023 Trench 8000 job 490 (3D model) D1_Digital_Object terrain The 3D model of trench 8000 job 490 2023-06-12
TH2022 Trench 5000 job 396 (3D model) D1_Digital_Object terrain The 3D model of trench 5000 job 396 2023-06-08
TH2022 SU 5067 A3_Stratigraphic_Interface Cut Cut into natural for great wall itself 2023-03-10
TH2022 SU 5065 A3_Stratigraphic_Interface Cut Small holes in SU 5042 surrounding large cuts 5045 and 5053 2023-03-10
TH2022 SU 5064 A3_Stratigraphic_Interface Cut Cut into natural for earliest ditch, pre-great wall 2023-03-10
TH2022 SU 5053 A3_Stratigraphic_Interface Cut Cut for large stone and pier 2022-06-27
TH2022 SU 5049 A3_Stratigraphic_Interface Cut W cut of 5042 2022-06-24
TH2022 SU 5047 A3_Stratigraphic_Interface Cut NW cut in 5042 2022-06-24
TH2022 SU 5045 A3_Stratigraphic_Interface Cut Circular cut in 5042 2022-06-24
TH2022 SU 5041 A3_Stratigraphic_Interface Cut Cut in 5040 2022-06-21
TH2022 SU 5037 A3_Stratigraphic_Interface Cut Cut for S wall foundation trench 2022-06-15
TH2022 SU 5035 A3_Stratigraphic_Interface Cut Cut for N wall foundation trench 2022-06-15
TH2022 SU 5027 A3_Stratigraphic_Interface Cut S wall construction cut into cut 5019 2022-06-07
TH2022 SU 5026 A3_Stratigraphic_Interface Cut N wall construction cut into cut 5016 2022-06-07
TH2022 SU 5024 A3_Stratigraphic_Interface Cut Cut in 5023 2022-06-07
TH2022 SU 5019 A3_Stratigraphic_Interface Cut Cut in 5018 2022-06-06
TH2022 SU 5016 A3_Stratigraphic_Interface Cut Cut in 5015 2022-06-06
TH2022 SU 5062 A8_Stratigraphic_Unit Fill Brown clay below 5056 2022-06-30 2023-06-07
TH2022 SU 5061 A8_Stratigraphic_Unit Fill Surface above 5042 2022-06-29 2023-06-07
TH2022 SU 5057 A8_Stratigraphic_Unit Fill Green clay under and along 5054 2022-06-29 2023-06-07
TH2022 SU 5056 A8_Stratigraphic_Unit Fill Mottled fill east of 5054 2022-06-29 2023-06-07
TH2022 SU 5052 A8_Stratigraphic_Unit Fill Fill of 5053 2022-06-27 2023-06-07
TH2022 SU 5051 A8_Stratigraphic_Unit Fill Subfloor below 5042 2022-06-28 2023-06-07
TH2022 SU 5050 A8_Stratigraphic_Unit Fill Fill of 5049 2022-06-24 2023-06-07